Hire a full-stack engineer
Takes a feature from the database to the screen without a handover in the middle.
Rates last reviewed 2026-08-15. A single role can sit below our blended engagement floor of $55 per hour, because the floor applies to a whole project team rather than to one person.
What this role does here
- Whole features end to end, including the boring half
- MVPs where splitting the work would cost more than doing it
- Filling the gap when your team is strong on one side and thin on the other
- Keeping the pieces consistent when there is nobody to argue with
When you need one
Early product work, or a small team where a specialist would spend half the week waiting for the other half of the stack. Beyond a certain size this stops being the cheap option.
A working slice of the product, deployed somewhere you can click it, rather than three separate branches that each work alone.
How the engagement works
The same terms as any other project with us. Nothing on this page is a different contract.
The contract is with our American company, whoever does the work and wherever they sit.
You meet the person before the engagement starts, and they stay on it.
Time and materials with a ceiling you set, or a fixed price for defined scope.
Code, design files and accounts transfer to you. 30 days of defect fixes after handover.
Where this role usually works
All servicesWeb platforms, internal systems and mobile apps built to run in production for years, not to demo well once. We take the product from a written scope to a deployed system with monitoring, backups and a team that can hand it over.
Marketing sites, customer portals and subscription products, from the design system to the billing. Built so your own team can edit the content and read the numbers without opening a ticket with us.
Questions about this role
Is one full-stack engineer cheaper than two specialists?
+
Per hour, yes. Per project, only up to a point: past a few thousand lines a day the switching cost between the two sides eats the saving. We say when the project has crossed that line.
What happens when the product outgrows one person?
+
The engagement changes shape rather than ending. The same person usually stays and specialists are added around them, which is cheaper than an introduction from scratch.
Need a full-stack engineer?
Say what the work is and how long it runs. You get a name, a rate and a start date within one business day.

